All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

Mortar Pump MM DT20

Store rating:5.0
(1 review)

Attributes

OtherMax. horizontal conveying distance
OtherMax. vertical conveying distance
OtherHopper Capacity
ProvidedMachinery Test Report
2 YearsWarranty
Motor, PLC, Pump, EngineCore Components
UNIQUE SELLING POINT:Powerful , Long Operation Hours
Video outgoing-inspection:Not Available
Brand Name:Mortel Meister
Power:35,9 KW
Place of Origin:Other Country
Weight:905 kg
Application:Mortar Transfer, Stucco, Self Leveling, Grouting
Dimension(L*W*H):3700x1450x1250 mm
Performance:Up to 15M3/Hour, 12mm aggregate
Reliability:Practical Design, Simple to Operate and Maintain
Certification:ISO 9001-2015, TUV, Aplus, CPT, TSE, KAS

Key attributes

Max. horizontal conveying distance
Other
Max. vertical conveying distance
Other
Hopper Capacity
Other
Machinery Test Report
Provided
Warranty
2 Years
Core Components
Motor, PLC, Pump, Engine
UNIQUE SELLING POINT
Powerful , Long Operation Hours
Video outgoing-inspection
Not Available
Brand Name
Mortel Meister
Power
35,9 KW
Place of Origin
Other Country
Weight
905 kg(1995.18lb)
Application
Mortar Transfer, Stucco, Self Leveling, Grouting
Dimension(L*W*H)
3700x1450x1250 mm(145.67x57.09x49.21in)
Performance
Up to 15M3/Hour, 12mm aggregate
Reliability
Practical Design, Simple to Operate and Maintain
Certification
ISO 9001-2015, TUV, Aplus, CPT, TSE, KAS

Packaging and delivery

Selling Units
Single item

Lead time

Product descriptions from the supplier

Minimum order quantity: 1 set
$1178-1767

Variations

Select now

Model Number: DT 20

DT 20

Max. Output Capacity

15 M3/H

Shipping

Shipping fee and delivery date to be negotiated. Chat with supplier now for more details.

Alibaba.com order protection

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Money-back protection

Claim a refund if your order doesn't ship, is missing, or arrives with product issues